1. Wharf system:
Thi Vai International Port Co., Ltd(TVP) – Phase 1 has been completed the construction and put into operation with the wharf and barge berth with the following specification:
1.1 Wharf No. 1:
- Length: 300 m
- Water depth in front of the wharf: -13.5 m (Chart Datum).
- Vessel receiving capacity: 80,000 DWT.
1.2 Barge berth A:
- Length: 140 m
- Water depth in front of the berth: -6.50 m (Chart Datum).
- Vessel receiving capacity: 5,000 DWT.
1.3 Barge berth B:
- Length: 175 m
- Water depth in front of the berth: -4.00 m (Chart Datum).
- Vessel receiving capacity: 2,000 DWT.
2. Warehouse and Yards.
2.1 Yards: includes 3 yards with the size of 110x110m; 255x138m; 255x108m. Total area: 67,630m2.
2.2 Warehouses:
a/ Warehouse for raw material: total area of 10,200 m2 (size: 68m x 150m)
b/ General cargo warehouse: total area of 7,200 m2 (size: 60m x 120m).
3. Equipment.
3.1 Equipment system:
TVP has been investing many kinds of modern equipment to meet all demands of the customers, namely as follows: Shore crane 40T: 02 pcs; excavator: 04 pcs; grabs: 05 pcs; Forklift: 01 pc.
3.1.1 Weight bridge: 2 weight bridges. (Weight bridge 80T (overload capacity of 150%: 02sets with the size of weight seat: 3x18m)
3.1.2 Shore crane Liebherr: 2 cranes (SWL 40T)
3.1.3 Excavator: 4 pcs
3.1.4 Grab bucket (6㎥): 5 pcs
3.2 List of equipment
No. | Name of equipment | Real quantity | Unit | Photo | Remarks |
01 |
Mobile crane Liebhher No. 1: 40T x 32m
Mobile crane Liebhher No. 2: 40T x 32m
|
02 | piece | ![]() |
SWL 40 ton / arm’s reach of 32 m |
02 | Kobelco excavator | 04 | piece | ![]() |
Steel scrap |
03 |
Grab/bucket 6㎥ (Engine & Electric) |
05 | piece | ![]() |
Steel scrap |
04 |
Forklift 4 tons |
01 | piece | ![]() |
|
05 | Weight bridge 80 Tons | 02 | piece | ![]() |